Skip to main content

News and rules

Hebbal flyover works and the Bellary Road approach: riding it during works

Hebbal's two new flyover loops are open, a tunnel under the junction has begun but tree felling is on hold, and the two-wheeler ban on the airport road's elevated corridor is on hold too. What it means for pickups in Hebbal and Yelahanka.

By Editorial team Published

Apply for a delivery job
Delivery riders in helmets waiting at a signal under a flyover at a wide Bengaluru junction after rain

At Hebbal, the flyover work riders waited for is done and the next job has started underneath. Both new loops are open: the ramp from the Nagawara side to Mekhri Circle since August 2025, and the loop from the Yelahanka and airport side since a trial run on 20 December 2025 (Deccan Herald, December 2025). The new work is a tunnel under the junction, and the National Green Tribunal has stopped tree felling for it while a challenge is heard; the next hearing is on 15 December 2026 (The News Minute, 21 October 2026). On the airport road, two-wheelers can use the elevated corridor between Sanjeevnagar Cross and Vidyashilp Junction again: the bike ban that started there on 4 September 2026 was reversed within days (Deccan Herald, September 2026).

The rest of the city's works are in our road works and closures round-up.

The two new loops

Loop Opened What it does Source
700-metre ramp Opened on 18 August 2025 Links Nagawara and KR Puram with Mekhri Circle Deccan Herald, August 2025
Two-lane loop Trial from 20 December 2025; formally opened on 1 January 2026 Takes traffic from Yelahanka, Jakkur and the airport straight towards Mekhri Circle Deccan Herald, December 2025; Deccan Herald, January 2026

Four days into the trial of the second loop, the Bangalore Development Authority (BDA) and the traffic police reported a 25% drop in peak-hour congestion at Hebbal. The queue moved south, though: tail-backs at Mekhri Circle sometimes reached Baptist Hospital (Deccan Herald, December 2025). So by late 2025, the slow part for city-bound riders had shifted from the flyover towards Mekhri Circle.

The tunnel under Hebbal Junction

The foundation stone for the first section of the tunnel road was laid on 28 June 2026: a 2.23-km, six-lane underground road from Hebbal Junction to the UAS staff quarters, due within 18 months (Swarajya, June 2026). The plan involves felling 1,128 trees; the GBA received more than 1,500 objections, and the tribunal has restrained the BDA from felling any trees while the challenge is heard (The News Minute, October 2026).

We found no road closure or diversion announced for the tunnel as of 23 October 2026. Any diversion for it would come from the traffic police, so keep an eye on their posts (how to follow them).

The airport road's elevated corridor: bike ban on hold

From 4 September 2026, two-wheelers and passenger autos were barred round the clock from the International Airport Road elevated corridor between Sanjeevnagar Cross and Vidyashilp Junction, and goods vehicles from 6 am to 10 pm, as a trial the police said they would review (The News Minute, September 2026; Business Today, August 2026). The bike part did not last. Sending goods vehicles, two-wheelers and autos down to the roads below at the same time caused queues and congestion at the diversion points, and Deccan Herald reported on 8 September 2026 that the state government had reversed the ban on two-wheelers and autos there. Goods vehicles still face limits at the set times, and the remaining curbs are to come in phases (Deccan Herald, September 2026). On 10 September NewsFirst reported that two-wheelers would stay allowed on the corridor until further notice (NewsFirst, September 2026). We found no report of the ban returning as of 23 October 2026.

So as of September 2026 you can take a two-wheeler up that stretch. The police asked riders on it to keep mostly to the leftmost lane, keep lane discipline, avoid unsafe overtaking and stay within 60 km/h (Deccan Herald, September 2026). A later phase could bring the ban back, so follow the signboards at the ramps and the traffic police's advisories.

Pickups in Hebbal and Yelahanka

Both areas sit on our Bellary Road corridor.

  • Hebbal: our area page lists Hebbal Lake, Hebbal railway station and Hebbal Bus Station as landmarks (OpenStreetMap, as of October 2026). Our data lists no metro stop close by.
  • Yelahanka: landmarks are Yelahanka Junction railway station, the Old Town bus station and Yelahanka Lake (OpenStreetMap, as of October 2026).

Holiday weekends are the worst time on this road. On Saturday night, 17 October 2026, the airport road and the stretches around Hebbal were among the worst jams as people left the city (Deccan Herald, October 2026). For the stretches that flood when it rains, check our guide to waterlogging and delivery routes before a wet shift. Outer Ring Road peak hours get their own post in November.

Want delivery work in north Bengaluru? Apply for a delivery job.

Topics: North Bangalore Roads

About the author

Editorial team

Our editorial team researches delivery work in Bengaluru, zone by zone, from public sources such as government pages, dated news reports and the companies' published terms.

Ready to ride? One short form, and our team calls you back.

Apply for a delivery job
Apply for a delivery job