Skip to main content

Getting around Bangalore

Namma Metro route map for delivery riders: lines, landmark stations and parking (October 2026)

Which Namma Metro lines run in October 2026, how to use stations as pickup and drop landmarks, what station parking costs, when the metro helps you reach a hub, and the lines still being built.

By Editorial team Published

Apply for a delivery job
A delivery rider on a scooter on a wet Bengaluru road below an elevated metro station

Three Namma Metro lines carry passengers in Bengaluru as of October 2026: Purple, Green and Yellow. For a delivery rider the metro matters in three ways: its stations are the easiest landmarks to agree on with a customer, its parking lets you leave a bike near a station for the day, and on some commutes it can get you to your hub. The lines still under construction matter too, because that is where roads are narrowed.

This guide gives the whole picture. Each line and topic has its own post, linked below.

The three lines running now

In a 16 October 2026 press release about late trains after a cricket match, BMRCL listed the end stations of all three lines: Whitefield (Kadugodi) and Challaghatta on the Purple Line, Madavara and Silk Institute on the Green Line, and Bommasandra and R.V. Road on the Yellow Line (Native Planet, as of October 2026). The network was 96.1 km long in mid-October 2026 (Swarajya, as of October 2026).

Line From – to Runs through Stations Our area pages on the way
Purple Whitefield (Kadugodi) – Challaghatta East to west: Whitefield, KR Puram, Indiranagar, MG Road, Majestic, Vijayanagar, Kengeri 37 (OSM) Whitefield, KR Puram, Indiranagar, MG Road, Majestic, Vijayanagar, Kengeri, Challaghatta
Green Madavara – Silk Institute North-west to south: Peenya, Yeshwanthpur, Rajajinagar, Malleshwaram, Majestic, Jayanagar, JP Nagar 32 (OSM) Peenya, Yeshwanthpur, Rajajinagar, Malleshwaram, Jayanagar, JP Nagar, Banashankari
Yellow RV Road – Delta Electronics Bommasandra South-east along Hosur Road: BTM Layout, Silk Board, Bommanahalli, Electronic City 16 (OSM) BTM Layout, Bommanahalli, Electronic City, Bommasandra

Station counts are the stops on each line's OpenStreetMap route, read in October 2026. Majestic is on both the Purple and the Green Line, and Rashtreeya Vidyalaya Road (RV Road) is on both the Green and the Yellow Line (same OSM routes).

Line by line:

Stations as pickup and drop landmarks

A metro station is a landmark that every customer, shopkeeper and map app knows by the same name. Our area pages list the stations closest to each locality, taken from OpenStreetMap (as of October 2026). The names don't always match the area: Malleshwaram has no station of its own name, and Whitefield and Electronic City each have three stations nearby. The line posts linked above go area by area.

How to use a station well:

  1. Name the station and the side. "Outside Indiranagar metro" can still mean several spots, so ask which side of the road or which shop the customer is next to.
  2. Use it to fix a vague address. If an order has only a road name, ask "Which metro station is nearest?" and ride there first. Then work in with the block, Cross and Main (our Bangalore address guide explains those).
  3. Watch out for names that look alike. Kadugodi Tree Park and Whitefield (Kadugodi) are two different stations on the Purple Line (OSM, as of October 2026). Majestic is shared by the Purple and Green Lines (Purple, Green on OSM), so ask which line's entrance.

Some areas have no station nearby in our data, for example Hebbal and Marathahalli. There, stick to the landmarks on the area page.

Parking a two-wheeler at a station

A full day of station parking costs a two-wheeler at most ₹30, with ₹15 covering the first 4 hours, and bikes can't be left overnight (BMRCL parking page, as of October 2026). Bikes can go in from 5 AM and stay until half an hour after the station's last train (BMRCL, as of October 2026).

BMRCL counts 15,832 two-wheeler spaces at stations and 2,216 more near stations (same parking page). Some stations have none. The full list and what it means for riders: two-wheeler parking at Namma Metro stations.

Taking the metro to your hub

The metro is a commute option, not a delivery vehicle. It helps when your vehicle waits for you at the hub (for example a rented EV, see our EV rental guide), or when you leave your bike at your home station for the day.

Two facts to plan around, both as of October 2026:

  • Last trains: on a normal night the final trains pull out of the end stations at 11 pm (Native Planet, reporting a BMRCL release). Sunday service usually starts at 7 am (Deccan Herald, May 2026). A late shift can end after the last train.
  • Fares: a trip costs between ₹10 and ₹90, priced by how many stations you ride (Deccan Herald, February 2025). The 5% annual rise due in February 2026 was held back (The South First, February 2026).

Worked example, timings and when riding is still simpler: taking the metro to your delivery hub.

Lines under construction: where roads are narrow

  • Pink Line. The elevated part, 7.5 km from Kalena Agrahara to Tavarekere on Bannerghatta Road, had its safety inspection from 6 to 8 October 2026 and was waiting for clearance in mid-October. The underground part from Dairy Circle to Nagawara is due for trials in November, and both parts are slated to open by May 2027 (Swarajya, as of October 2026). Details for JP Nagar, Hulimavu, Shivajinagar and Nagavara: Pink Line works.
  • Blue Line on the Outer Ring Road. Test trains are due on the stretch from the Byappanahalli depot past KR Pura to Marathahalli by 15 November 2026, and the corridor is also slated to open by May 2027 (same Swarajya report). That stretch runs through our east zone.
  • Phase 3. Two new elevated corridors, JP Nagar 4th Phase to Kempapura along the Outer Ring Road West and Hosahalli to Kadabagere along Magadi Road (PM India, approved August 2024). Work on the ground hadn't begun by September 2026 (Oneindia, as of September 2026). Which roads it will touch: Phase 3, the roads to watch.

Metro lines by zone

  • East: Purple Line from Whitefield through KR Puram; Blue Line works on the Outer Ring Road.
  • Central: Purple Line through Indiranagar, MG Road and Majestic; Green Line through Majestic, Chickpete and KR Market (OSM).
  • South: Green Line through Jayanagar and JP Nagar; Yellow Line along Hosur Road; Pink Line on Bannerghatta Road.
  • North: Green Line at Yeshwanthpur; Pink Line underground towards Nagawara.
  • West: Purple Line through Vijayanagar, Kengeri and Challaghatta; Green Line through Peenya, Rajajinagar, Malleshwaram and Banashankari; Phase 3 along Magadi Road.

Quick answers

  • Can I leave my bike at a station overnight? No. BMRCL says night parking is not allowed (BMRCL, as of October 2026).
  • Where do I check today's train times? On the BMRCL timings page, which warns that times may shift for planned work (as of October 2026). Look on the day you travel.

Looking for delivery work near a metro line? Apply for a delivery job.

Topics: Namma Metro

About the author

Editorial team

Our editorial team researches delivery work in Bengaluru, zone by zone, from public sources such as government pages, dated news reports and the companies' published terms.

Ready to ride? One short form, and our team calls you back.

Apply for a delivery job
Apply for a delivery job